Data center infrastructure

07 / Power & Deliver

The building, the power, and the cooling from one company.

A data center is a power and thermal problem wrapped in a building. Splitting those across a general contractor, an electrical sub, and a separate energy developer is how schedules slip.

We build the shell, self-perform the mechanical and electrical, and can generate the power on site.

Hyperscale and edge

Ground up data center construction at hyperscale, AI compute campuses, and distributed edge facilities closer to the load. We provide accurate cost estimates and budgeting for your data center construction project, ensuring that it stays within budget and is delivered on time.

Resilient and hardened facilities

For federal, defense, and mission critical work, resilience is a design requirement rather than an upgrade: physical hardening, redundant power paths, islanding capability, and continuity of operations through a grid event.

We design to the redundancy and resilience standard the project actually requires, and we name that standard explicitly in the documents rather than reaching for a marketing tier.

Cooling and sustainability

Cooling that draws the majority of its water from reclaimed wastewater, which matters most in arid and water constrained regions, engineered alongside the on-site generation rather than after it.

Power density, heat rejection, and redundancy are sized to the workload, including the high density racks that AI training and inference demand. Every requirement we have been handed so far, we have engineered around.

As builders committed to green building and sustainable design, we integrate these principles into every aspect of our construction projects, helping you achieve your sustainability goals while reducing environmental impact.